From delivery to first heat

There are two ways to install a Sōk sauna. Our crew can build it on site in a single day, or you can assemble the pre-cut kit yourself over a weekend. Either way, a licensed electrician connects the heater.

Sauna panels going up on site Thermally modified timber up close
Built in one dayElectrician arranged
Pre-cut kit, numbered panelsInstall included in price

Built for you, in a day

Our own crew handles everything from the site consult to the first heat. You pick the spot; we leave you with a working sauna and a swept site.

Time on site
One day
Who builds it
Our crew
Install cost
$1,800
Electrician
Arranged

Built by you, over a weekend

A pre-cut kit with numbered panels, bagged fixings and an illustrated guide. Most people finish in two days with a friend and a drill.

Time on site
~2 days
Who builds it
You + 1
Install cost
Included
Electrician
You book
  1. Crew measuring a garden site
    01About 45 minutes

    Free site consult

    We visit to check access, ground and power, and agree exactly where the sauna sits. Bring your questions; we bring a tape measure and a level.

  2. Hand on the heater control dial
    02Within 2 business days

    Fixed quote and install date

    You get one fixed price covering delivery, build and handover, plus a confirmed install date. No variations on the day.

  3. Sauna heater stones up close
    031-3 days, before delivery

    Base preparation

    We pour or set a level base to suit your ground, or brief your landscaper on the exact spec if you'd rather use your own trades.

  4. Sauna panels going up on site
    04One day

    Delivery and build

    Our crew arrives early with the panels and builds the sauna in place: floor, walls, roof, glass, benches and heater. Usually finished by mid-afternoon, with the site swept.

  5. Analogue sauna thermometer
    052-3 hours, same day

    Electrical connection

    A licensed electrician from our network connects the heater and control panel to a dedicated circuit, tests it and leaves you the compliance certificate.

  6. Heater glow at first light
    06About 30 minutes

    Handover and first session

    We fire it up, walk you through the controls, the stones and the care routine, then leave you to it. That part is yours.

  1. The Cabin outdoor sauna
    01About 1 hour

    Check your site

    Pick a level spot with clear access for long panels and power within reach. Our site checklist walks you through it, and we can review photos for free.

  2. Sauna heater stones up close
    021–2 weekends

    Prepare the base

    Lay a level concrete slab, pavers or adjustable pedestals at least 100 mm larger than the sauna footprint on every side. Level matters more than material.

  3. Analogue sauna thermometer
    03Book 2–3 weeks ahead

    Book a licensed electrician

    In Australia the heater must be connected by a licensed electrician. Book them to run a dedicated circuit and connect the heater once the build is done. We'll send them the wiring spec.

  4. Thermally modified timber up close
    04Kerbside, on pallets

    Take delivery

    The kit arrives kerbside with every panel numbered, all fixings bagged by step and the heater boxed separately. Keep it dry and flat until you build.

  5. Sauna panels going up on site
    052 days, 2 people

    Build the sauna

    Follow the illustrated guide: floor, walls, roof, glass, door, benches, then the heater mount. You'll need a drill, a spirit level, a step ladder and a rubber mallet.

  6. Hand on the heater control dial
    062–3 hours

    Connect the heater

    Your electrician connects the heater and control panel, tests the circuit and issues a certificate of compliance. Keep it with your warranty paperwork.

  7. Bench underglow in the evening
    07About 1 hour

    Run the first heat

    Heat the empty sauna for an hour with the door closed to cure the heater and settle the timber. Expect a faint smell the first time; it won't come back.

What your site needs

Four things decide whether a spot will work. If you're unsure about any of them, a free site consult will settle it.

A level base

Concrete slab, pavers or adjustable pedestals, 100 mm larger than the footprint on every side, with no more than 5 mm of fall per metre.

Clear access

A path at least 900 mm wide from the street to the site. The longest panels are 2.4 m, so check tight corners and side gates.

A dedicated circuit

The heater runs on its own circuit from your switchboard. Larger heaters may need three-phase power; your electrician will confirm.

Room to breathe

At least 300 mm clear of fences and walls, and 1 m of clearance above the roof to overhanging branches.

Side by side

Have us install Install it yourself
Install cost $1,800 Included
Build time One day, by our crew About two days, two people
Base Prepared by us or briefed to your landscaper You prepare it to our spec
Electrician Arranged by us, same day You book a licensed electrician
Delivery To the site, by our crew Kerbside, on pallets
Warranty 10 years structural 10 years structural, when built to the guide

Installing a Sōk, answered

How long does it take to install a Sōk sauna?

With our full-service install, the build itself takes one day and the heater is connected the same afternoon. Self-installers usually need about two days with two people, plus time to prepare the base beforehand.

Can I install the sauna myself?

Yes. Every Sōk is available as a pre-cut kit with numbered panels, bagged fixings and an illustrated guide. If you are comfortable with a drill and a spirit level, two people can build it over a weekend.

Do I need an electrician?

Yes, for both options. In Australia the heater must be connected by a licensed electrician. With full service we arrange this for you; if you self-install, you book your own and we send them the wiring spec.

Do I need council approval for an outdoor sauna?

Most backyard saunas fall under exempt or complying development, but rules vary by council, size and distance to boundaries. Check with your local council before ordering. We can share the drawings they usually ask for.

What kind of base does a sauna need?

A level concrete slab, pavers or adjustable pedestals, at least 100 mm larger than the footprint on every side, with no more than 5 mm of fall per metre. Level matters more than material.

Does self-installing affect the warranty?

No. The 10-year structural warranty applies to both options, provided the sauna is built to our guide on a compliant base and the heater is connected by a licensed electrician.

Can I switch from self-install to full service?

Yes, any time before your delivery date. Just let us know and we will lock in an install crew and adjust your order.

Not sure which suits you?

Book a free site consult. We'll look at your space and tell you honestly whether a weekend build makes sense.